Can I specify component brands used in my market?
Yes. Send your preferred brands, series or approved component list, together with the installation voltage and destination. We review compatibility and availability, then confirm the agreed components in the specification. Destination-specific certification and documentation requirements are reviewed separately.
Can you put my logo on the machine?
Include your logo artwork and branding brief with the enquiry. Logo placement, nameplates, machine colours, manuals and packing options are agreed for the selected equipment. The final artwork and branding scope are confirmed before production.
Can a machine be configured for my required speed?
Share the target speed, package dimensions, materials, feeding conditions and shift requirements. The operating range depends on the application and configuration. Sustained output and its test conditions are agreed for the project and checked with the relevant packaging or loads.
What cooperation terms can distributors discuss?
Tell us your market coverage, equipment experience and expected order plan. We can discuss dealer pricing, repeat orders, private-label options, territory or project arrangements, training and spare parts. Any exclusivity or special commercial terms require a separate agreement.
How does an ODM project for a factory begin?
Start with package samples or drawings, process requirements, target output and available space. We review the application, identify the proposed design changes and assess feasibility. Development scope, sample trials, responsibilities, cost and timing are then agreed for the project.
Can one machine handle several packaging sizes?
This depends on the package structures, dimensions, material and tooling. Send each format and the expected changeover frequency so the compatible range and adjustment method can be reviewed.
What is the minimum order quantity?
MOQ depends on the equipment and the extent of customization. Tell us your initial machine quantity and expected repeat orders; the quotation will confirm the applicable terms.
Can equipment connect to my existing line?
Share the layout, conveyor heights, flow direction, throughput and relevant control information. The proposal defines the interfaces and responsibilities for each handover.
How are lead time and project support agreed?
The schedule follows the confirmed specification, component availability and trial or development scope. Discuss the documents, spare parts, training, remote assistance and any on-site service you need so these can be included in the proposal.