Case Erector Cost: Compare What Each Quote Includes

Case erecting equipment in a workshop
Case erector overview. Scope the equipment and the line transfer separately.

A case erector quote is easier to compare once the scope of bottom closing and the handoff to packing are written down. Request the same case drawings, production sequence and acceptance criteria for each option. Then compare equipment, integration and ongoing operating costs separately. The installed price may include work outside the machine frame, especially on an existing line.

Put all quotes on the same machine scope

Start with the case dimensions, board, batch mix and required bottom closure. Mark the minimum and maximum configurations to be demonstrated. Confirm what feeds the magazine, how it can be replenished and whether a size change needs parts, adjustments or both. Record separately any items offered as options. The case erector range provides a starting point for the equipment shortlist.

Break out the installation and integration costs

Compare the machine and any closing head as one group. Put delivery, placement and utility connection in a second group. In a third group, list conveyors, control interfaces, protection, line testing and training. Ask which party supplies each line item and where the work is handed over. A blank scope item should be resolved before comparing quote totals.

Calculate recurring cost per accepted case

Over a representative period, add consumables, relevant labour, planned service and the handling cost of cases that need rework. Divide by accepted cases delivered to packing over that same period. Record separately any interruptions attributed to the packing line. If accepted output is still unknown, show the assumptions and confirm them in a sample trial before treating the result as operating cost.

Use the same operating period in each estimate

Estimate annual and shift costs separately. Keep one-off integration costs in the installed-cost column. Separate regularly replaced consumables from occasional service items, and state which intervals are provisional. If a lower quote omits the transfer conveyor, place its eventual cost under integration before comparing the options. Avoid treating an assumed labour reduction as a saving until you know who will refill the magazine, check output and clear rejects.

Ask each quote to name the same handover point

Use one table with columns for the item, the supplier responsible, its quoted status and the evidence required. The handover point might be the discharge of a square, bottom-sealed empty case ready for packing. Specify its condition and delivery rate, then compare complete scopes. That makes it possible to distinguish a genuine price difference from work still missing from one quotation.