
A liner can be open when it leaves the bag inserter and partly closed by the time the carton reaches the filler. A useful trial follows the same carton from arrival to the point where filling starts. Check the erected case, the liner fit and the transfer after insertion. Agree who owns each handoff before choosing a stand-alone bag inserter or a combined packing line.
Start with an erected case
Send a sample from the upstream machine. Record the inside box dimensions, top flap position and whether the bottom is already sealed. A carton standing loose on a bench may look different from one coming off a case erector. Check that the case arrives square, faces the intended direction and stops where the liner tool expects it. Trial the smallest and largest actual boxes separately.
Inspect the liner at the insertion point
Show how the bag is supplied, including its dimensions, material and opening direction. Agree where the liner bottom should sit and what the opening or fold over the carton rim should look like for your filler. After insertion, check for a trapped bag corner, uneven opening or film pulled out of place. Photograph the failed states as well as a good sample.
Repeat the check at the filling position
Follow a lined carton across the real transfers, guides and stops. Check the opening again where the filling equipment meets the case. If the liner catches on a guide or the carton stops off centre, note the last position where it looked right. Run a carton through at the planned spacing and include a representative restart if the line stops regularly.
Define what happens when a liner is missing
Agree with the line supplier how to identify a carton that should not be filled. The proposed arrangement might call for an operator check or a detection and stop function, depending on the scope. Run an identified test carton to prove the approved response. Record whether the upstream machine keeps supplying empty cases and how production resumes after the condition is cleared. This makes it clear which functions are part of the equipment acceptance and which belong to the site procedure.
Put both interfaces on the order drawing
Use the case erector range for the upstream box and the packing line modules overview for the bag handling step. Send empty samples, liner stock, filling position and conveyor heights. Ask the supplier to state the accepted liner condition at the filling point and who provides each adjacent interface.
