Case sealer power requirements belong on the first quotation request. A message that says ‘we use 110 V’ leaves out the frequency, the phase and the equipment that will share the station. Ask your facilities team to identify the supply available at the machine position. Give the supplier that information alongside your carton sizes, then ask them to confirm the exact electrical configuration they are quoting.
Identify the supply at the machine position
Send the nominal voltage, frequency and number of phases as separate fields. If your team says ‘110 V, 60 Hz’, confirm the nominal value on the site electrical schedule and whether that supply is available where the machine will stand. A rating copied from another production bay may describe a different circuit. An outlet photo can help locate the proposed position, while the facilities record supplies the specification.
Define what the quote has to power
A stand-alone taping station and a sealer with powered infeed or discharge conveyors have different boundaries. List each item you expect in the quote and the existing equipment that runs beside it. If the proposed configuration also uses compressed air, give the separately available air supply. Use the carton sealing machine range to identify the carton handling and taping arrangement you want quoted.
Request a written match
Put the available site supply and the proposed machine input side by side. Ask the supplier to state voltage, frequency, phase and rated input for the exact configuration. The same response should identify auxiliaries that need a separate feed. Mark a missing value as an open item in the quotation. Have the site electrical team review the proposed connection and protection against the equipment documents before installation.
Read the two supply lines in the proposal
Suppose the sealer and a separately supplied conveyor will be installed together. The sealer proposal may list an incoming supply for the machine while the conveyor quotation lists one for its own motor controls. Record those as two entries, even if both suppliers use the same word for the station. Also ask whether either supplier is quoting the interface that starts or stops the adjacent equipment. That question belongs on the line drawing alongside the handoff height. A match on voltage by itself leaves both the electrical load and the control responsibility unresolved.
Send a complete request
A request can say ‘60 Hz available at the packing position; nominal voltage and phase to be checked by facilities; quote includes sealer and powered discharge conveyor’. Add the carton size range, filled weight, tape pattern and operating schedule. Use the installation conditions checklist to collect the remaining site information. The shortlisted machine should have a written match on both the carton specification and the site supply.