Case Counter or Product Counter? Reconcile Output at Shift End

The sealer shows 500 passes. Dispatch has 490 cases. Before calling either figure wrong, ask what crossed each counting point. A pass through a machine, a saleable shipping case and a product packed inside it are three different units.

Walk one marked case through rework

Choose a marked trial case and follow the authorised rework route. Does it pass the same counter a second time? Where are rejected and hand-finished cases recorded? Draw the boundary on the layout. If ten of 500 counted passes were second passes and all 490 distinct cases were accepted, both displays can be correct.

Close the shift with a unit and a cut-off

Note the time and the cases still between the counter and dispatch. Reconcile accepted cases first, then multiply by the actual pack quantity for each SKU if a product-piece total is required. A mixed shift containing six-packs and twelve-packs cannot use one multiplier. Keep the counter reading, rework tally and accepted cases as separate columns.

What about the last case before midnight?

Choose one event for the production record, such as acceptance at dispatch, and keep that convention for both shifts. If a case was counted at the sealer before midnight but checked after midnight, carry it forward as work in progress. Logging both timestamps makes the apparent one-case difference explainable.