Ask three machine suppliers for three prices and the conveyor gap can still belong to nobody. A useful line proposal names the party responsible for each transfer, including the carton test that shows the equipment works together.
Start where the product changes hands
Take the move from case sealer to palletising infeed. Record the case orientation, support height, usable width and what the upstream station should do when the downstream position is occupied. Give each item an owner and a person who accepts the result. Two drawings that show the same conveyor centreline can still disagree on the position of the first driven roller.

Ask for one witnessed transfer
Use a representative loaded carton. Observe its leading edge crossing the joint, its position at the stop and its release when the next station is ready. Enter any open issue against the interface number on the layout. Before ordering, ask Xunding to identify the equipment in its supply scope, customer-supplied items and who coordinates the combined trial.
What if the customer supplies the conveyor?
Make the conveyor a named item on the same scope sheet. Identify who supplies its drawing, who confirms the receiving height and who witnesses the transfer test. If the conveyor is unavailable for the factory trial, mark the interface as pending site verification and carry it into the installation checklist.
One factory visit, two machines, and a layout revised on site
