
When production moves from one box type to another, the forming tools need to match the next blank. On the setup shown in our demonstration, a typical box-type mould change takes about six minutes. The upper and lower tooling, blank guides and pickup positions work together to prepare the machine for the next box.
What does a six-minute mould change mean?
The practical benefit is a shorter interruption between box jobs. For a packaging operation that switches between different orders, straightforward access to the tooling makes changeover an important part of machine selection alongside production speed.
About six minutes is the typical mould replacement time reported by Xunding for the demonstrated setup. The time needed to resume production also depends on the box design, the adjustments required and the operator’s familiarity with the equipment. Material preparation, trial boxes and further setup checks should be included when planning a complete production changeover.
The two supplied videos explain the adjustments in detail. Their running times include explanation and checks; they are not a timed six-minute changeover test.
What Should a Quote for a New Tray Former Tooling Set Include?
A new tray size may require an adjustment, a set of change parts or a new tooling set. The quote should identify which part of the blank or forming process forces that decision. Start with the current and proposed drawings, then separate engineering, hardware and the trial. Two quotations for ‘one new size’ can cover very different work.

What exactly changed on the blank?
Lay the two drawings side by side with the feed edge marked. Compare flat dimensions, finished dimensions, lid or corner structure, crease positions and the places where adhesive or locks hold the assembled tray. A longer central panel may move the guides while leaving the corner formation unchanged. Two trays with the same outer length and width may need different tooling if the flaps and crease lines work differently. Include the material and caliper used for both versions. Supplier review should identify the feature that makes the existing tooling reusable or unsuitable.
Three different scopes hide behind a size change
An adjustment keeps the current tooling and changes the confirmed guide positions or settings. A partial change replaces the components that contact or support the altered features and lists what is reused. A full tooling set covers the parts needed to form a different geometry within the limits of that machine. Ask for the part list and a note on whether the original format remains available after the change. Keep any machine modifications separate from the tooling price. A controller setting can organise the changeover, but it cannot create physical clearance at a forming station.
Separate one-off costs from recurring work
Ask whether the amount covers drawing review, design, manufacture, mounting and an agreed sample trial. Clarify who supplies production blanks, who carries transport and which revisions the quoted work covers. Then make a separate line for changeover labour, spare or wear components and any repeat checks needed in production. A set that costs less to buy can take more work each time it is installed. Compare the cost of one changeover only after defining the stop point, the end point and the first accepted output.
Require two lines for an alteration
On a partial-tooling quote, ask for a line for ‘parts supplied’ and another for ‘parts retained’. Attach a marked drawing showing the interfaces between the two. Then mark whether those retained parts are exchanged during a format change, stay permanently installed or need a separate setting. The distinction is useful when comparing installation time and when identifying which pieces must be stored together.
Ask for proof at both ends of the change
Use the same version of the blank that was quoted. Record the tooling identifiers, installation reference points and first acceptable box. If the existing format must stay in production, change back and run it again with its own documented settings. Inspect the folds and box dimensions after both changes. Keep one accepted sample for each format. The supplier’s checklist should show which items were supplied and which were reused so the next person can reproduce the setup.
Send enough information to compare prices
Send the machine model, current tooling identification, both drawing revisions, production blanks and the intended mix of formats. Ask for quoted scope, trial criteria and the expected changeover tasks on one page. Compare the line items rather than the total until you can see both proposals cover the same job. Where a supplier cannot confirm the tooling without examining samples, keep that part provisional and agree how it will be resolved.
Upper mould: match the tooling to the next blank
The upper tooling must work with the shape and pickup area of the next cardboard blank. In the first video, the technician handles a removable metal plate and works at its fastening points with an Allen key. Close-up views show the blue suction cups, guide rods and surrounding hardware.
This part of the demonstration makes the changeover easy to understand: the operator can see and reach the components that need attention. The replacement tooling and pickup arrangement must be checked against the intended blank before the machine returns to its operating cycle.

Lower mould: set the forming area for the new box
The lower mould and forming guides need to suit the finished box dimensions and fold positions. The videos show the operator measuring positions, adjusting the fixture and working around the blank with hand tools. The metal crossbars, brackets and fixing points can be seen directly in the operation footage.
Changing the upper tooling alone is only part of the job. The corresponding lower setup must be aligned so that the board reaches the forming area in the intended position. The blank drawing and a finished sample provide useful references when moving between box types.

Check the guides, suction position and machine settings
The demonstration also includes guide adjustments, suction-cup positioning and checks at the control panel. These details connect the mould change to reliable blank handling: the next blank needs to be picked up and presented correctly as well as formed into the right shape.
For repeat orders, keeping the box drawing, tooling identification and confirmed setup information together can help the operator prepare the next changeover. For a different box structure, review which parts need replacement and which positions require adjustment with Xunding before assuming the same setup applies.

Confirm the first box before continuing the batch
After the tooling and settings have been checked, assess a trial box against the agreed sample. Look at finished dimensions, squareness, fold alignment and corner formation. Where the process uses adhesive, include joint position and bonding quality in the check.
A short mould change is useful when it leads to a suitable first box. Confirming the sample before continuing the batch helps identify an incorrect position or setting early. Machine access, tooling replacement and trial operation must follow the instructions for the supplied equipment and be carried out by trained personnel.
Planning to run several box formats?
Send Xunding the flat blank drawings and finished samples for each box type, together with the board specification, required output and how often you expect to change jobs. This gives us a clear basis for discussing the machine configuration, the moulds required and the changeover steps between your actual products.
When arranging an acceptance demonstration, agree which two box types will be used and whether the timing covers tooling replacement alone or the full process through the first acceptable box. That makes the result useful for your own production planning.
Discuss your box formats with Jason Chen
Explore box forming machines
